Aerospace Manufacturer
MSP eliminates scrap for manufacturer machining rib components
At a glance
Challenge
To accurately locate high value parts and reduce the high scrap rate.
Result
Automated, accurate and fast part alignment with no scrap.
Products used
Before
A Tier One supplier for aerospace parts came to MSP with a problem they were having when machining the rib component of the Airbus A330 wings.
The supplier had scrapped several parts due to not being able to accurately locate them during three separate machining cycles.
Their method involved fitting dowels in each end of a gun–drilled bore that went right through the part. The part needed to be rotated from end-to-end on the machine, aligning the two bores using a DTI. They then had to manually adjust the parts position until they aligned it correctly.
This process was very time consuming and not particularly accurate.
After
MSP knew NC-PartLocator from their MSP PerfectPart suite of products could create an alignment quickly and accurately, by probing a sphere at each end of the bore.
This method worked very effectively and MSP were able to setup the machining programs to run the probing cycles automatically during the machining.
NC-PartLocator was used for several functions in the machining process:
- Part alignment
- Alignment verification
- Bore size and position inspection
- Surface offsets for machining
- Re-alignment during post clamping changes
The project was a success and parts were coming off the machine and passing inspection well within tolerance. MSP also used their NC-Checker product to show the machine tool was working accurately, therefore giving MSP’s customer total confidence in its performance.
More case studies
MSP helps Formula 1 team reduce part setup by 9.5 hours
A leading F1 team used products from MSP PerfectPart to reduce their part setup time from 10 hours to 38 minutes.
More case studies
Production time cut from 20 weeks to 3 days for Leonardo
MSP PerfectPart allowed Leonardo to machine complex tiltrotor blades with extreme distortion and cut production time to 3 days.
More case studies
SST now producing 700% more parts per week
SST is now manufacturing 7 times more parts per week and reduced its part setup time from 4 hours to 25 minutes.
More case studies
Part setup cut from 5 hours to 10 minutes for 3T-am
3T-am now produces right-first-time parts and leaves the machine to run overnight for full 24/7 lights-out automation.
More case studies
100% productivity increase for castings manufacturer
Doncasters has also been able to simplify fixturing and bring work in-house to aid production.
More case studies
Pentaxia eliminates 100% concession rate
Pentaxia also reduced production time for a set of parts by 50%, from 40 hours to 20 hours.
More case studies
GTR Composites Group cuts chassis setup time by 66%
With MSP PerfectPart, GTR is now also meeting customer demands for tighter tolerances and more complex work.
More case studies
Quickstep halves setup time and reduces rework by 75%
Quickstep's CNC machine assessments have also been cut by 96%, from 2-4 days to 1-2 hours.
Be in a case study.
If you’ve had impressive results and want to be involved in your own case study, we want to hear from you! It’s a great way to shout about the collaboration between our great companies.