Success Stories: How we've helped our clients

MSP help Formula 1 team reduce part setup by 9.5 hours
We removed the manual steps to reduce part setup time and eliminated errors causing scrap. The team now get designs onto the track faster than ever.

Part setup cut from 5 hours to 10 minutes for 3T-am
3T-am now produce right-first-time parts and leave the machine to run overnight for full 24/7 lights-out automation.

SST now producing 7 times more parts per week
The elimination of inaccurate part setup and machine errors decreased SST’s scrap rate and increased its part production by 7 times.

F1 team eliminates part to part variation with help from MSP
MSP identified where the CNC machine was drifting out of tolerance and worked with the company to restore the machine’s capability.

Production time reduced from 7 hours to 4 hours
We removed the manual measurement and multiple stages in the part setup process and supported them to eliminate scrap and rework.

Quickstep Technologies halves part setup time
The company now also conduct more detailed machine assessments in 96% less time and have reduced their rework rate by 75%.

100% productivity increase for castings manufacturer
Other benefits from using MSP’s products has been the ability to simplify fixturing and bring work in-house to aid productivity.

How MSP helped BAE Systems save £21 million
MSP’s solution was critical to streamline production of the Nozzle Bay Doors for the F-35 and save millions over the lifetime of the project.

Machine analysis time reduced from months to minutes
By improving the part location and ensuring accuracy of the machine tool, Vert were also able to minimise non-conformance significantly.
Be in a case study.
If you’ve had impressive results and want to be involved in your own case study, we want to hear from you! It’s a great way to shout about the collaboration between our great companies.